IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0061 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $688 Implemented
MO0061 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $14,300 Implemented
MO0061 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,403 $20 Not Implemented
MO0061 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,628 $1,240 Implemented
MO0061 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,981 $1,170 Implemented
MO0061 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,377 $18,250 Implemented
KU0366 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $760 Not Implemented
KU0366 # 12 Y:1992 12 1992 RECOVER WASTE HEAT FROM EQUIPMENT $133 $200 Not Implemented
KU0366 # 11 Y:1992 11 1992 INSTALL SET-BACK TIMERS $240 $600 Not Implemented
KU0366 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $267 $170 Not Implemented
KU0366 # 01 Y:1992 01 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,148 $6,400 Not Implemented
KU0366 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $830 $150 Not Implemented
KU0366 # 04 Y:1992 04 1992 INSTALL TURBULATORS $621 $1,320 Not Implemented
KU0366 # 05 Y:1992 05 1992 KEEP BOILER TUBES CLEAN $559 $450 Not Implemented
KU0366 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $694 $200 Not Implemented
KU0366 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $407 $350 Not Implemented
KU0366 # 08 Y:1992 08 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $75 Not Implemented
KU0366 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-45 $0 Not Implemented
OK0371 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,816 $0 Implemented
OK0371 # 02 Y:1992 02 1992 INSULATE FEEDWATER TANK $253 $150 Implemented
OK0371 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $267 $69 Implemented
OK0371 # 04 Y:1992 04 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $220 $185 Implemented
OK0371 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,767 $2,434 Not Implemented
OK0371 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $138 Implemented
OK0371 # 07 Y:1992 07 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,621 $23,222 Not Implemented