IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0115 # 06 Y:1995 06 1995 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,957 $4,000 Not Implemented
HO0115 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $776 $1,011 Not Implemented
HO0115 # 02 Y:1995 02 1995 KEEP BOILER TUBES CLEAN $2,569 $2,800 Not Implemented
HO0115 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $2,276 $400 Not Implemented
HO0115 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $583 $250 Not Implemented
HO0115 # 05 Y:1995 05 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,913 $8,000 Not Implemented
AS0162 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $690 Not Implemented
AS0162 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,748 $2,943 Not Implemented
AS0162 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $734 $1,386 Implemented
AS0162 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $159 $0 Implemented
AS0162 # 05 Y:1995 05 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,099 $13,500 Not Implemented
AS0162 # 06 Y:1995 06 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $156 $500 Not Implemented
AS0162 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $145 $173 Implemented
SF0059 # 04 Y:1995 04 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,861 $8,820 Not Implemented
SF0059 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,569 $0 Not Implemented
SF0059 # 05 Y:1995 05 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $699 $0 Implemented
SF0059 # 06 Y:1995 06 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $638 $550 Implemented
SF0059 # 07 Y:1995 07 1995 OPTIMIZE PLANT POWER FACTOR $1,778 $3,588 Not Implemented
SF0059 # 08 Y:1995 08 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $367,210 $633,645 Not Implemented
SF0059 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,509 $2,695 Implemented
SF0059 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,741 $25,412 Implemented
SF0059 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,715 $3,548 Implemented
SF0059 # 10 Y:1995 10 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $172,172 $282,160 Implemented
OD0033 # 01 Y:1995 01 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,595 $4,616 Not Implemented
OD0033 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,994 $6,431 Not Implemented