IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 206 Sugar And Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0191 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,804 $57,885 n/a
IC0191 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,379 $0 n/a
IC0191 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $6,711 $2,345 n/a
IC0191 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $190 $150 n/a
IC0191 # 06 Y:2011 06 2011 REPAIR AND ELIMINATE STEAM LEAKS $714 $200 n/a
IC0191 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $893 $0 n/a
IC0191 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,189 $690 n/a
IC0191 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,161 $109,685 n/a
OK0804 # 14 Y:2011 14 2011 OPTIMIZE PLANT POWER FACTOR $2,073 $8,279 Not Implemented
OK0804 # 13 Y:2011 13 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,107 $19,271 Not Implemented
OK0804 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $807 $1,843 Not Implemented
OK0804 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,295 $2,286 Not Implemented
OK0804 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,632 $4,325 Not Implemented
OK0804 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,362 $750 Implemented
OK0804 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,244 $4,120 Not Implemented
OK0804 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $18,797 Not Implemented
OK0804 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,996 $28,404 Not Implemented
OK0804 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,796 $56,474 Implemented
OK0804 # 04 Y:2011 04 2011 INSTALL SET-BACK TIMERS $740 $1,625 Not Implemented
OK0804 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $12,835 $19,625 Not Implemented
OK0804 # 02 Y:2011 02 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,961 $238,050 Not Implemented
OK0804 # 01 Y:2011 01 2011 Install Anaerobic Digester $544,130 $5,652,880 Not Implemented