Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 206 | Sugar And Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0612 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $200 | $0 | Implemented |
AM0612 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,520 | $280 | Implemented |
AM0612 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,510 | $70 | Not Implemented |
NC0444 # 08 Y:2012 | 08 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,828 | $32,000 | Not Implemented |
NC0444 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,193 | $53,707 | Not Implemented |
NC0444 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,844 | $62,067 | Not Implemented |
NC0444 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,178 | $971 | Implemented |
NC0444 # 04 Y:2012 | 04 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,902 | $4,000 | Implemented |
NC0444 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,731 | $500 | Implemented |
NC0444 # 02 Y:2012 | 02 | 2012 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $3,445 | $8,500 | Not Implemented |
NC0444 # 01 Y:2012 | 01 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $5,257 | $2,000 | Implemented |
SF0406 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $4,954 | $21,408 | Not Implemented |
SF0406 # 09 Y:2012 | 09 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,696 | $10,439 | Not Implemented |
SF0406 # 08 Y:2012 | 08 | 2012 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $25,304 | $93,999 | Not Implemented |
SF0406 # 07 Y:2012 | 07 | 2012 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $90,076 | $288,023 | Not Implemented |
SF0406 # 06 Y:2012 | 06 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,352 | $1,460 | Not Implemented |
SF0406 # 05 Y:2012 | 05 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,567 | $3,773 | Implemented |
SF0406 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,629 | $818 | Not Implemented |
SF0406 # 03 Y:2012 | 03 | 2012 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,483 | $0 | Implemented |
SF0406 # 02 Y:2012 | 02 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,401 | $0 | Implemented |
SF0406 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,385 | $0 | Implemented |