Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 2064 Candy & Other Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0204 # 12 Y:2004 12 2004 $11,190 $6,417 Implemented
SU0173 # 01 Y:2004 01 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $13,244 $0 Not Implemented
SU0173 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,991 $0 Not Implemented
SU0173 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $57 Implemented
SU0173 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $117 Not Implemented
SU0173 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,444 $4,290 Not Implemented
SU0173 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,001 $9,164 Implemented
SU0173 # 07 Y:2004 07 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,555 $48,418 Not Implemented
TA0057 # 01 Y:2003 01 2003 $823,680 $180,000 Not Implemented
TA0057 # 02 Y:2003 02 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $12,100 $0 Implemented
TA0057 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,175 $5,783 Implemented
TA0057 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,400 $0 Implemented
TA0057 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $72 Implemented
TA0057 # 06 Y:2003 06 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $550 $175 Not Implemented
TA0057 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $460 $336 Not Implemented
TA0057 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $275 $180 Implemented
TA0057 # 09 Y:2003 09 2003 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $240 $110 Not Implemented
TA0057 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $395 Implemented
TA0057 # 11 Y:2003 11 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $120 $0 Implemented
UU0032 # 01 Y:2002 01 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $83 $86 Not Implemented
UU0032 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,155 $12,000 Not Implemented
UU0032 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $988 $2,604 Not Implemented
UU0032 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $4,743 $600 Not Implemented
UU0032 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,517 $17,563 Not Implemented
UU0032 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,273 $343 Not Implemented