IAC Assessment: TA0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Candy and Nuts for Ice Cream
NAICS 311340 - Nonchocolate Confectionery Manufacturing
SIC 2064 - Candy & Other Confectionery Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 70,000
Annual Production 28,666,600 Pounds
Production Hrs. Annual 6,336
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,685 3,986,340 kWh $0.04
Electricity Demand $62,339 8,217 kW-months/year $7.59
Electricity Fees $6,367 - $ -
Natural Gas $111,889 16,053 MMBtu $6.97
TOTAL ENERGY COSTS $352,280
RECOMMENDED SAVINGS* $845,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,570
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$823,680
Cost:
$180,000
- - - - - - $823,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$823,680
-
%
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$12,100
Cost:
-
- - $12,100 1,037 - - - - -
-
kWh
$12,100
1,037
kW-months/year
-
-
MMBtu
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,175
Cost:
$5,783
$3,055 84,097 $2,120 182 - - - - $3,055
84,097
kWh
$2,120
182
kW-months/year
-
-
MMBtu
-
-
%
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,400
Cost:
-
$1,400 38,850 - - - - - - $1,400
38,850
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,300
Cost:
$72
$680 18,780 $620 53 - - - - $680
18,780
kWh
$620
53
kW-months/year
-
-
MMBtu
-
-
%
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$550
Cost:
$175
- - - - $550 85 - - -
-
kWh
-
-
kW-months/year
$550
85
MMBtu
-
-
%
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$460
Cost:
$336
- - - - $460 70 - - -
-
kWh
-
-
kW-months/year
$460
70
MMBtu
-
-
%
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$275
Cost:
$180
$275 7,527 - - - - - - $275
7,527
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$240
Cost:
$110
- - - - $240 37 - - -
-
kWh
-
-
kW-months/year
$240
37
MMBtu
-
-
%
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$200
Cost:
$395
$140 3,925 $60 5 - - - - $140
3,925
kWh
$60
5
kW-months/year
-
-
MMBtu
-
-
%
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$120
Cost:
-
- - - - $120 18 - - -
-
kWh
-
-
kW-months/year
$120
18
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$845,500
Cost:
$187,051
$5,550 153,179 $14,900 1,277 $1,370 210 $823,680 - $5,550
153,179
kWh
$14,900
1,277
kW-months/year
$1,370
210
MMBtu
$823,680
-
%
TOTAL IMPLEMENTED Savings:
$20,570
Cost:
$6,430
$5,550 153,179 $14,900 1,277 $120 18 - - $5,550
153,179
kWh
$14,900
1,277
kW-months/year
$120
18
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production