IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 2064 Candy & Other Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0005 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $962 Implemented
SJ0005 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $4,556 Not Implemented
SJ0005 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $270 $0 Not Implemented
SJ0005 # 02 Y:2023 02 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,445 $5,613 Not Implemented
SJ0005 # 06 Y:2023 06 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,992 $2,536 Implemented
SJ0005 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $658 Not Implemented
SF0551 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,322 $0 Not Implemented
SF0551 # 02 Y:2020 02 2020 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,721 $702 Not Implemented
SF0551 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $4,946 Not Implemented
SF0551 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $797 $1,133 Not Implemented
SF0429 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,991 $0 Not Implemented
SF0429 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $5,601 Implemented
SF0429 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $9,736 $36,817 Implemented
SF0429 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $14,210 $38,634 Not Implemented
SF0429 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,006 $16,020 Not Implemented
SF0429 # 02 Y:2013 02 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $578 $810 Implemented
SF0429 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $228,512 $0 Not Implemented
SF0429 # 01 Y:2013 01 2013 OPERATE BOILERS ON HIGH FIRE SETTING $18,109 $0 Not Implemented
SF0406 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,567 $3,773 Implemented
SF0406 # 07 Y:2012 07 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $90,076 $288,023 Not Implemented
SF0406 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,401 $0 Implemented
SF0406 # 09 Y:2012 09 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,696 $10,439 Not Implemented
SF0406 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,629 $818 Not Implemented
SF0406 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,385 $0 Implemented
SF0406 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,483 $0 Implemented