Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 2064 | Candy & Other Confectionery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0277 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,442 | $150 | Implemented |
ST0078 # 02 Y:1986 | 02 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $2,122 | $1,034 | Not Implemented |
ST0078 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $796 | $537 | Not Implemented |
ST0078 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $123 | $0 | Not Implemented |
ST0078 # 05 Y:1986 | 05 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $856 | $0 | Not Implemented |
ST0078 # 06 Y:1986 | 06 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $540 | $1,000 | Not Implemented |
ST0078 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $463 | $93 | Not Implemented |
ST0078 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,044 | $0 | Not Implemented |
ST0078 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,145 | $233 | Not Implemented |
TN0277 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,434 | $15,840 | Implemented |
ST0078 # 01 Y:1986 | 01 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $8,261 | $1,000 | Not Implemented |
TN0277 # 03 Y:1986 | 03 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,251 | $500 | Implemented |
TN0277 # 04 Y:1986 | 04 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $2,016 | $125 | Implemented |
TN0277 # 05 Y:1986 | 05 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $581 | $2,500 | Not Implemented |
TN0277 # 06 Y:1986 | 06 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $264 | $111 | Not Implemented |
TN0277 # 07 Y:1986 | 07 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $826 | $1,700 | Implemented |
TN0277 # 08 Y:1986 | 08 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $396 | $0 | Implemented |
TN0277 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $661 | $440 | Implemented |
TN0277 # 10 Y:1986 | 10 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $149 | $220 | Implemented |
ST0077 # 09 Y:1986 | 09 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $735 | $278 | Implemented |
ST0077 # 08 Y:1986 | 08 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $169 | $150 | Implemented |
ST0077 # 06 Y:1986 | 06 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $27,027 | $30,000 | Implemented |
ST0077 # 05 Y:1986 | 05 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $122 | $30 | Implemented |
ST0077 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $944 | $900 | Implemented |
ST0077 # 03 Y:1986 | 03 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $66 | $0 | Implemented |