Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 2066 | Chocolate And Cocoa Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0385 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,136 | $373 | Not Implemented |
SF0385 # 18 Y:2010 | 18 | 2010 | USE OPTIMUM THICKNESS INSULATION | $36,228 | $325,369 | Implemented |
SF0385 # 17 Y:2010 | 17 | 2010 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $57,997 | $240,000 | Not Implemented |
SF0385 # 16 Y:2010 | 16 | 2010 | OPTIMIZE PLANT POWER FACTOR | $9,677 | $23,715 | Implemented |
SF0385 # 15 Y:2010 | 15 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,355 | $18,588 | Not Implemented |
SF0385 # 14 Y:2010 | 14 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,082 | $12,770 | Implemented |
SF0385 # 13 Y:2010 | 13 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $7,188 | Not Implemented |
SF0385 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,533 | $20,000 | Not Implemented |
SF0385 # 11 Y:2010 | 11 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $97,444 | $119,566 | Not Implemented |
SF0385 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $5,266 | $5,951 | Implemented |
SF0385 # 09 Y:2010 | 09 | 2010 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $640 | $633 | Implemented |
SF0385 # 08 Y:2010 | 08 | 2010 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $187 | $154 | Not Implemented |
SF0385 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $1,608 | $750 | Implemented |
SF0385 # 06 Y:2010 | 06 | 2010 | USE PHOTOCELL CONTROLS | $14,856 | $6,800 | Implemented |
SF0385 # 05 Y:2010 | 05 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,350 | $771 | Not Implemented |
SF0385 # 03 Y:2010 | 03 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,195 | $1,760 | Implemented |
SF0385 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,270 | $0 | Implemented |
SF0385 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,418 | $0 | Implemented |
SF0382 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $9,146 | $2,700 | Implemented |
SF0382 # 12 Y:2010 | 12 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,423 | $62,855 | Implemented |
SF0382 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $733 | $2,953 | Implemented |
SF0382 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $12,608 | $36,493 | Implemented |
SF0382 # 09 Y:2010 | 09 | 2010 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $165,218 | $158,868 | Not Implemented |
SF0382 # 08 Y:2010 | 08 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,262 | $14,381 | Not Implemented |
SF0382 # 07 Y:2010 | 07 | 2010 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $10,035 | $18,281 | Not Implemented |