IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
SIC 207 Fats And Oils
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0087 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $798 Implemented
IP0087 # 10 Y:2017 10 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $606,139 $2,150,000 Not Implemented
SF0501 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $147,360 $665,154 Not Implemented
SF0501 # 05 Y:2017 05 2017 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,356 $1,821 Not Implemented
SF0501 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,074 $1,769 Implemented
SF0501 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $84 Not Implemented
SF0501 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,047 $0 Not Implemented
SF0501 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,520 $0 Implemented
IP0053 # 01 Y:2015 01 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $57,305 $915 Implemented
IP0053 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,294 $160 Implemented
IP0053 # 03 Y:2015 03 2015 APPLY FOR INVESTMENT INCENTIVES $38,029 $5,000 Implemented
IP0053 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,650 $2,685 Implemented
IP0053 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $456 $924 Implemented
OR0659 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,705 $20,000 Implemented
OR0659 # 02 Y:2015 02 2015 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $26,260 $7,200 Implemented
OR0659 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $906 $900 Not Implemented
OR0659 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $6,192 $8,000 Implemented
OR0659 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $4,259 $5,617 Not Implemented
OR0659 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,463 $0 Not Implemented
OR0659 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $1,353 $8,000 Implemented
OR0659 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,165 $3,410 Not Implemented
UA0138 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $557 $186 Not Implemented
UA0138 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,270 $3,920 Not Implemented
UA0138 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $3,174 $3,210 Not Implemented
UA0138 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $671 $658 Not Implemented