Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 2074 Cottonseed Oil Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0257 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $67,341 $2,000 Implemented
MS0257 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $71,237 $88,344 Not Implemented
MS0257 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $36,924 $54 Implemented
MS0257 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,889 $17,026 n/a
MS0257 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,325 $348 Implemented
MS0257 # 06 Y:2004 06 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,318 $2,673 Implemented
MS0257 # 07 Y:2004 07 2004 USE OPTIMUM THICKNESS INSULATION $3,906 $1,356 Not Implemented
MS0257 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,163 $742 Not Implemented
MS0257 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,231 $255 Not Implemented
MS0257 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $632 $1,029 Implemented
MS0257 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $969 Not Implemented
OK0510 # 05 Y:1996 05 1996 USE PHOTOCELL CONTROLS $340 $113 Not Implemented
OK0510 # 01 Y:1996 01 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $16,000 $7,960 Not Implemented
OK0510 # 02 Y:1996 02 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $37 $25 Not Implemented
OK0510 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,445 $588 Not Implemented
OK0510 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,303 $0 Not Implemented
KG0071 # 08 Y:1996 08 1996 RECYCLE WHITE WATER $27,769 $2,930 Implemented
KG0071 # 07 Y:1996 07 1996 REDUCE SCRAP PRODUCTION $414,056 $1,500 Implemented
KG0071 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $467 $194 Implemented
KG0071 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $722 $1,230 Implemented
KG0071 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,406 $12,000 Not Implemented
KG0071 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,966 $37,100 Implemented
KG0071 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,535 $15,675 Implemented
KG0071 # 01 Y:1996 01 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $134,608 $2,000,000 Not Implemented
AR0022 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,133 $420 Not Implemented