IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
SIC 2079 Edible Fats And Oils, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0347 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,034 $35,384 Implemented
MZ0347 # 06 Y:2023 06 2023 REPAIR AND ELIMINATE STEAM LEAKS $1,668 $380 Implemented
MZ0347 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,683 $0 Implemented
UA3019 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,076 $11,695 Implemented
UA3019 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,814 $800 Implemented
UA3019 # 08 Y:2012 08 2012 INSULATE BARE EQUIPMENT $2,412 $1,248 Implemented
UA3019 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $10,114 $16,643 Implemented
LL0360 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,259 $3,570 Implemented
LL0360 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $16,577 $1,321 Implemented
LL0360 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $627,674 $22,250 Implemented
LL0360 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $1,050 Implemented
LL0360 # 09 Y:2011 09 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $378 $390 Implemented
BD0286 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140,820 $28,500 Implemented
BD0286 # 13 Y:2005 13 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,243,590 $504,283 Implemented
BD0286 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $350 Implemented
BD0286 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,506 $0 Implemented
BD0286 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,152 $1,200 Implemented
BD0286 # 06 Y:2005 06 2005 INSTALL TURBULATORS $8,810 $12,000 Implemented
BD0286 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $9,987 $2,625 Implemented
BD0286 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,974 $14,000 Implemented
BD0286 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94,025 $122,830 Implemented
OR0474 # 01 Y:2004 01 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $8,887 $4,500 Implemented
OR0474 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $2,700 $2,030 Implemented
OR0474 # 02 Y:2004 02 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $9,900 $2,770 Implemented
OR0474 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,700 $5,900 Implemented