Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,169
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0614 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $5,096 | $15,079 | n/a |
SF0614 # 11 Y:2024 | 11 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $115,467 | $137,973 | n/a |
SF0614 # 01 Y:2024 | 01 | 2024 | MINIMIZE WATER USAGE | $26,559 | $990 | n/a |
SF0614 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $297,557 | $1,115,655 | n/a |
SF0614 # 02 Y:2024 | 02 | 2024 | INSTALL REPLACEMENT DOORS | $18,319 | $3,440 | n/a |
SF0614 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,200 | $39,025 | n/a |
SF0614 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $928 | $1,336 | n/a |
SF0614 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,821 | $44,432 | n/a |
SF0614 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $30,298 | $117,500 | n/a |
SF0614 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,093 | $915 | n/a |
SF0614 # 09 Y:2024 | 09 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,015 | $65,531 | n/a |
AS0567 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $57,803 | $10,720 | n/a |
AS0567 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,430 | $774,239 | n/a |
AS0567 # 05 Y:2023 | 05 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $647 | $384 | n/a |
AS0567 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $86,125 | $165,996 | n/a |
AS0567 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,255 | $31,926 | n/a |
UA0282 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $927 | $1,176 | n/a |
UA0282 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $95 | $250 | n/a |
UA0282 # 02 Y:2023 | 02 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,292 | $5,675 | n/a |
UA0282 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $3,672 | $165 | n/a |
UA0282 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,227 | $1,174 | n/a |
UA0282 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,197 | $297 | n/a |
SF0609 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $426,217 | $1,338,900 | n/a |
SF0609 # 07 Y:2023 | 07 | 2023 | USE OPTIMUM THICKNESS INSULATION | $8,652 | $21,442 | n/a |
SF0609 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,153 | $9,827 | n/a |