IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,502

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0234 # 01 Y:1992 01 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $810 $250 Implemented
CO0234 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $230 Implemented
CO0234 # 03 Y:1992 03 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $505 $150 Implemented
CO0234 # 04 Y:1992 04 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $85 $10,700 Implemented
CO0234 # 05 Y:1992 05 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $390 $1,380 Implemented
CO0234 # 06 Y:1992 06 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $360 $1,480 Implemented
OR0136 # 01 Y:1992 01 1992 INSULATE BARE EQUIPMENT $597 $465 Implemented
OR0136 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $413 $1,000 Implemented
OR0125 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $18,739 $0 Implemented
OR0125 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,392 $6,072 Implemented
OR0125 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,391 $35,042 Implemented
OR0125 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $0 Implemented
OR0125 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,934 $83,040 Implemented
IA0004 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $0 Implemented
IA0004 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,401 $2,453 Implemented
IA0004 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,523 $1,200 Implemented
IA0004 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $531 $1,703 Implemented
IA0004 # 05 Y:1991 05 1991 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $654 $889 Implemented
IA0004 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $827 $686 Implemented
IA0004 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $20 Implemented
RU0133 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,491 $0 Implemented
RU0133 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,929 $0 Implemented
RU0133 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $460 $166 Implemented
RU0133 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $414 $0 Implemented
RU0133 # 05 Y:1991 05 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,014 $11,000 Implemented