Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
320
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0550 # 03 Y:2020 | 03 | 2020 | INSTALL TURBULATORS | $3,921 | $11,250 | Implemented |
UF0550 # 04 Y:2020 | 04 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,928 | $2,800 | Implemented |
UF0534 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,685 | $27,820 | Not Implemented |
UF0534 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,586 | $333,760 | Not Implemented |
UF0534 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,018 | $0 | Not Implemented |
UF0534 # 03 Y:2019 | 03 | 2019 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $8,399 | $570 | Not Implemented |
UF0534 # 05 Y:2019 | 05 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,000 | $18,400 | Not Implemented |
MI0350 # 10 Y:2019 | 10 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $6,123 | $5,800 | Not Implemented |
MI0350 # 11 Y:2019 | 11 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,540 | $6,160 | Not Implemented |
MI0350 # 13 Y:2019 | 13 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,052 | $80 | Implemented |
MI0350 # 12 Y:2019 | 12 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,203 | $410 | Implemented |
MI0350 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,638 | $200 | Not Implemented |
MI0350 # 05 Y:2019 | 05 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,816 | $46,090 | Not Implemented |
MI0350 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,627 | $1,126 | Implemented |
MI0350 # 06 Y:2019 | 06 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $18,916 | $13,100 | Not Implemented |
MI0350 # 03 Y:2019 | 03 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $65,500 | $142,400 | Not Implemented |
MI0350 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $36,067 | $25,990 | Not Implemented |
MI0350 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $234,952 | $172,151 | Implemented |
MI0350 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $137,608 | $23,779 | Implemented |
MI0350 # 08 Y:2019 | 08 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,352 | $3,860 | Not Implemented |
MI0332 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,178 | $480 | Not Implemented |
MI0332 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,127 | $1,980 | Not Implemented |
MI0332 # 03 Y:2018 | 03 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $29,437 | $39,837 | Implemented |
MI0332 # 04 Y:2018 | 04 | 2018 | INCREASE EFFICIENCY OF TRUCKS | $17,850 | $31,926 | Not Implemented |
MI0332 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $37,879 | $3,280 | Implemented |