IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0198 # 08 Y:1997 08 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $152 $40 Not Implemented
MO0198 # 09 Y:1997 09 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,582 $8,400 Not Implemented
MO0198 # 10 Y:1997 10 1997 RECOVER AND REUSE WASTE MATERIAL $276 $0 Implemented
MO0198 # 11 Y:1997 11 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $6,176 $18,000 Not Implemented
KU0372 # 01 Y:1992 01 1992 USE MULTIPLE-EFFECT EVAPORATORS $133,326 $720,000 Not Implemented
KU0372 # 02 Y:1992 02 1992 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $91,322 $0 Not Implemented
KU0372 # 03 Y:1992 03 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $46,997 $208,233 Not Implemented
KU0372 # 04 Y:1992 04 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $35,349 $117,700 Not Implemented
KU0372 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,723 $39,435 Not Implemented
KU0372 # 06 Y:1992 06 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $32,127 $90,000 Implemented
KU0372 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $29,914 $0 Implemented
KU0372 # 08 Y:1992 08 1992 REPAIR AND ELIMINATE STEAM LEAKS $5,325 $670 Implemented
KU0372 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,789 $10,400 Implemented
KU0372 # 10 Y:1992 10 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,785 $70,400 Not Implemented
KU0372 # 11 Y:1992 11 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,367 $8,000 Not Implemented
KU0372 # 12 Y:1992 12 1992 INSTALL TIMERS AND/OR THERMOSTATS $4,086 $0 Not Implemented
KU0372 # 13 Y:1992 13 1992 INSULATE BARE EQUIPMENT $3,082 $10,685 Implemented
KU0355 # 01 Y:1991 01 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,740 $3,120 Not Implemented
KU0355 # 02 Y:1991 02 1991 REDESIGN PROCESS $2,417 $2,500 Not Implemented
KU0355 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $150 Not Implemented
KU0355 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $250 Not Implemented
KU0355 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $300 $280 Not Implemented
MO0037 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $369 $608 Implemented
MO0037 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $0 Implemented
MO0037 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $181 Implemented