IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,243

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0279 # 06 Y:2015 06 2015 USE OPTIMUM THICKNESS INSULATION $4,666 $1,810 Implemented
MI0279 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,329 $40 Implemented
MI0279 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,877 $2,520 Implemented
MI0279 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $1,612 $482 Implemented
MI0279 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,456 $1,782 Not Implemented
MI0279 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,317 $3,280 Not Implemented
MI0279 # 12 Y:2015 12 2015 USE PHOTOCELL CONTROLS $1,139 $480 Implemented
MI0279 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $634 $1,760 Implemented
SF0461 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,239 $75 Implemented
SF0461 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,905 $3,053 Implemented
SF0461 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $2,517 $4,371 Implemented
SF0461 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,570 $7,605 Implemented
SF0461 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,819 $80,476 Implemented
SF0461 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $231 $1,000 Not Implemented
SF0461 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $424 $2,004 Not Implemented
SF0461 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN WATER LINES AND VALVES $666 $50 Implemented
OK0907 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,237 $706 Implemented
OK0907 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,302 $332 Implemented
OK0907 # 03 Y:2015 03 2015 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $20,444 $1,413 Not Implemented
OK0907 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,869 $9,983 Not Implemented
OK0907 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,448 $1,250 Implemented
OK0907 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,388 $503 Not Implemented
OK0907 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,403 $800 Implemented
OK0907 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $29,042 $30,000 Not Implemented
OK0907 # 09 Y:2015 09 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,429 $960 Implemented