Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,342
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0835 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,644 | $17,103 | Not Implemented |
OK0835 # 03 Y:2012 | 03 | 2012 | REPLACE BOILER | $10,532 | $96,000 | Not Implemented |
UM0411 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,396 | $2,000 | Not Implemented |
UM0411 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,402 | $200 | Not Implemented |
UM0411 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $821 | $100 | Implemented |
UM0411 # 04 Y:2012 | 04 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $56,000 | $225,000 | Not Implemented |
UM0411 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $15,341 | $5,000 | Not Implemented |
UD0865 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $3,291 | $8,000 | Not Implemented |
UD0865 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $4,289 | $1,200 | Not Implemented |
UD0865 # 03 Y:2012 | 03 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,494 | $36,750 | Not Implemented |
UD0865 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,395 | $1,000 | Not Implemented |
UD0865 # 05 Y:2012 | 05 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,071 | $1,500 | Not Implemented |
UD0865 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $992 | $1,000 | Not Implemented |
UD0865 # 07 Y:2012 | 07 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $966 | $1,600 | Not Implemented |
UD0865 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,463 | $0 | Not Implemented |
UD0865 # 09 Y:2012 | 09 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,015 | $9,000 | Not Implemented |
UD0865 # 10 Y:2012 | 10 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $3,073 | $9,219 | Not Implemented |
UD0865 # 11 Y:2012 | 11 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $42,877 | $83,500 | Not Implemented |
UD0865 # 12 Y:2012 | 12 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $20,832 | $25,000 | Not Implemented |
UD0865 # 13 Y:2012 | 13 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,846 | $24,600 | Not Implemented |
UD0865 # 14 Y:2012 | 14 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $7,322 | $0 | Not Implemented |
UD0865 # 15 Y:2012 | 15 | 2012 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,957 | $123,000 | Not Implemented |
OR0591 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $920,649 | $25,909 | Implemented |
OR0591 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $93,821 | $27,749 | Not Implemented |
OR0591 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $6,968 | Implemented |