Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,342
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0805 # 13 Y:2009 | 13 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,689 | $0 | Implemented |
UD0805 # 14 Y:2009 | 14 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,965 | $0 | Implemented |
UD0805 # 15 Y:2009 | 15 | 2009 | OPTIMIZE PLANT POWER FACTOR | $1,903 | $5,000 | Not Implemented |
UD0805 # 16 Y:2009 | 16 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,428 | $1,000 | Implemented |
UD0805 # 17 Y:2009 | 17 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,423 | $0 | Not Implemented |
UD0805 # 18 Y:2009 | 18 | 2009 | ISOLATE HOT OR COLD EQUIPMENT | $666 | $0 | Implemented |
DL0037 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $105,200 | $0 | Implemented |
DL0037 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $644 | $140 | Implemented |
DL0037 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,050 | $5,000 | Not Implemented |
DL0037 # 04 Y:2009 | 04 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,500 | $880 | Not Implemented |
DL0037 # 05 Y:2009 | 05 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,330 | $8,800 | Not Implemented |
DL0037 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,254 | $35,000 | Not Implemented |
UM0352 # 01 Y:2009 | 01 | 2009 | INSULATE FEEDWATER TANK | $8,739 | $3,454 | Implemented |
UM0352 # 02 Y:2009 | 02 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,001 | $11,363 | Not Implemented |
UM0352 # 03 Y:2009 | 03 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,300 | $1,700 | Implemented |
UM0352 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,569 | $1,060 | Not Implemented |
UM0352 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,200 | $0 | Implemented |
UM0352 # 06 Y:2009 | 06 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,800 | $1,900 | Not Implemented |
UM0352 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,454 | $0 | Implemented |
UM0352 # 08 Y:2009 | 08 | 2009 | INSTALL OCCUPANCY SENSORS | $504 | $920 | Implemented |
UM0352 # 09 Y:2009 | 09 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,944 | $1,200 | Implemented |
SF0369 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $70 | Implemented |
SF0369 # 02 Y:2009 | 02 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $565 | $60 | Implemented |
SF0369 # 03 Y:2009 | 03 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $15,017 | $14,000 | Implemented |
SF0369 # 04 Y:2009 | 04 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $34,213 | $37,500 | Implemented |