Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0303 # 04 Y:2024 | 04 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $475 | $0 | n/a |
IC0303 # 13 Y:2024 | 13 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $3,324 | $1,624 | n/a |
IC0303 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,947 | $546 | n/a |
IC0303 # 11 Y:2024 | 11 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,164 | $0 | n/a |
IC0303 # 10 Y:2024 | 10 | 2024 | INSULATE BARE EQUIPMENT | $2,366 | $843 | n/a |
IC0303 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,399 | $4,154 | n/a |
IC0303 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,438 | $3,433 | n/a |
IC0303 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $182 | $328 | n/a |
IC0303 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $38 | n/a |
IC0303 # 05 Y:2024 | 05 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $31,214 | $13,640 | n/a |
IC0303 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $750 | $0 | n/a |
IC0303 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,368 | $3,859 | n/a |
IC0303 # 01 Y:2024 | 01 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,502 | $3,692 | n/a |
IC0303 # 14 Y:2024 | 14 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $774 | $36 | n/a |
IC0303 # 15 Y:2024 | 15 | 2024 | INSULATE BARE EQUIPMENT | $2,406 | $1,236 | n/a |
IC0303 # 16 Y:2024 | 16 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,328 | $441,248 | n/a |
IC0303 # 17 Y:2024 | 17 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,739 | $211 | n/a |
BD0404 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,392 | $76,240 | Implemented |
BD0404 # 01 Y:2012 | 01 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $49,969 | $32,000 | Not Implemented |
BD0404 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,137 | $20 | Implemented |
BD0404 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,023 | $25,000 | Not Implemented |
BD0404 # 07 Y:2012 | 07 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $1,669 | $100 | Implemented |
BD0404 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $4,130 | $8,000 | Implemented |
BD0404 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,573 | $1,500 | Implemented |
IC0027 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $750 | Not Implemented |