IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0034 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $275 Implemented
NL0034 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $238 $500 Implemented
NL0034 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $248 $0 Not Implemented
NL0034 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $493 $0 Not Implemented
NL0034 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,679 $4,388 Not Implemented
NL0034 # 02 Y:2019 02 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,862 $11,390 Not Implemented
NL0034 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,764 $8,337 Implemented
KU0347 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $384 $950 Not Implemented
KU0347 # 11 Y:1991 11 1991 ELIMINATE LEAKS IN WATER LINES AND VALVES $241 $0 Not Implemented
KU0347 # 10 Y:1991 10 1991 INSULATE BARE EQUIPMENT $628 $1,006 Not Implemented
KU0347 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $711 $139 Not Implemented
KU0347 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,100 $0 Not Implemented
KU0347 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $2,842 $1,050 Not Implemented
KU0347 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $3,537 $4,945 Not Implemented
KU0347 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,394 $6,010 Not Implemented
KU0347 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,337 $0 Not Implemented
KU0347 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $12,542 $27,500 Not Implemented
KU0347 # 01 Y:1991 01 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,274 $25,000 Not Implemented
KU0264 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $2,720 Implemented
KU0264 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $168 $0 Implemented
KU0264 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $229 $0 Not Implemented
KU0264 # 04 Y:1988 04 1988 INSTALL AUTOMATIC STACK DAMPER $663 $650 Not Implemented
KU0264 # 03 Y:1988 03 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $566 $1,200 Implemented
KU0264 # 02 Y:1988 02 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $825 $40 Implemented