Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
262
matching recommendationsSIC | 2082 | Malt Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0562 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $20,350 | $500 | Implemented |
AS0562 # 02 Y:2023 | 02 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,196 | $37 | Implemented |
AS0562 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,428 | $1,545 | Implemented |
AS0562 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $301 | $56 | Implemented |
DL0226 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,451 | $0 | Implemented |
DL0226 # 03 Y:2023 | 03 | 2023 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,053 | $0 | Implemented |
DL0226 # 10 Y:2023 | 10 | 2023 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $56,102 | $91,218 | Implemented |
DL0226 # 09 Y:2023 | 09 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,355 | $9,585 | Implemented |
DL0226 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $1,234 | $0 | Implemented |
DL0226 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,718 | $0 | Implemented |
DL0226 # 07 Y:2023 | 07 | 2023 | REDUCE VENTILATION AIR | $1,643 | $57 | Implemented |
MU0032 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $465 | $0 | Implemented |
MU0032 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36 | $126 | Implemented |
UA0274 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,102 | $1,000 | Implemented |
UA0274 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,205 | $8,523 | Implemented |
LS2308 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $878 | $525 | Implemented |
OR0770 # 01 Y:2023 | 01 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,142 | $6,704 | Implemented |
OR0770 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,249 | $9,000 | Implemented |
MA0851 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $135,448 | $385,041 | Implemented |
MA0851 # 07 Y:2023 | 07 | 2023 | AVOID FROST FORMATION ON EVAPORATORS | $434 | $216 | Implemented |
MA0851 # 03 Y:2023 | 03 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,576 | $1,000 | Implemented |
MA0851 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,544 | $5,977 | Implemented |
MA0850 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $18,844 | $1,000 | Implemented |
IP0166 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,433 | $1,162 | Implemented |
IP0166 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $198 | $416 | Implemented |