IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0585 # 05 Y:2019 05 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,928 $14,000 Not Implemented
OR0717 # 01 Y:2019 01 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,163 $0 Implemented
OR0717 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $20,973 $587 Not Implemented
OR0717 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,061 $7,650 Not Implemented
OR0717 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,624 $3,273 Not Implemented
OR0717 # 05 Y:2019 05 2019 RECOVER AND REUSE WASTE MATERIAL $204,215 $143,400 Not Implemented
UU0143 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $100 Implemented
UU0143 # 02 Y:2019 02 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,516 $3,140 Implemented
UU0143 # 03 Y:2019 03 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $510 $50 Not Implemented
UU0143 # 04 Y:2019 04 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,501 $3,184 Not Implemented
UU0143 # 05 Y:2019 05 2019 MINIMIZE WATER USAGE $11,728 $50,000 Not Implemented
UU0143 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $220 $275 Implemented
UU0147 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $54,000 $300,000 Not Implemented
UU0147 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $3,521 $2,917 Implemented
UU0147 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $7,000 Implemented
UU0147 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,746 $1,200 Implemented
UU0147 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,081 $1,800 Implemented
UU0147 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $130 $0 Implemented
UU0147 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $400 Implemented
UU0146 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $37,500 $225,000 Not Implemented
UU0146 # 02 Y:2019 02 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,186 $2,000 Not Implemented
UU0146 # 03 Y:2019 03 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,780 $0 Implemented
UU0146 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $350 Not Implemented
UU0146 # 05 Y:2019 05 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $850 $0 Not Implemented
UU0146 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $693 $2,575 Not Implemented