IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0097 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $6,781 $127,800 Not Implemented
BS0097 # 04 Y:2017 04 2017 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $751 $5,250 Not Implemented
BS0097 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $319 $2,189 Not Implemented
BS0097 # 06 Y:2017 06 2017 ADOPT IN-HOUSE MATERIAL GENERATION $3,137 $60,000 Not Implemented
BS0097 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $236 $131 Not Implemented
BS0097 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $212 $277 Not Implemented
BS0097 # 09 Y:2017 09 2017 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140 $160 Not Implemented
UU0115 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $296 $0 Implemented
UU0115 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $444 $438 Implemented
UU0115 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
UU0115 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $931 $2,500 Not Implemented
UU0115 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,766 $0 Implemented
OR0682 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $104,297 $70,000 Not Implemented
OR0682 # 02 Y:2017 02 2017 REPLACE BOILER $4,289 $23,625 Not Implemented
OR0682 # 03 Y:2017 03 2017 REPLACE BOILER $1,937 $9,815 Not Implemented
OR0678 # 01 Y:2016 01 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $4,885 $2,948 Not Implemented
OR0678 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,663 $247 Implemented
OR0678 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $972 $2,626 Implemented
DL0137 # 01 Y:2014 01 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $17,190 $20,000 Implemented
DL0137 # 02 Y:2014 02 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $14,240 $5,460 Not Implemented
DL0137 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,900 $38,400 Not Implemented
DL0137 # 04 Y:2014 04 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $890 $2,220 Not Implemented
DL0137 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,520 $8,430 Not Implemented
DL0137 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $745 $160 Not Implemented
DL0137 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,350 $6,300 Implemented