IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

631

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0561 # 05 Y:2024 05 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $4,166 $2,943 Not Implemented
SU0561 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,218 $995 Not Implemented
SU0561 # 11 Y:2024 11 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $31,857 $400,736 Not Implemented
SU0561 # 10 Y:2024 10 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $170 $556 Implemented
SU0561 # 09 Y:2024 09 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $13,655 $30,000 Not Implemented
SU0561 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $704 $1,196 Implemented
SU0561 # 07 Y:2024 07 2024 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,101 $1,100 Implemented
OR0795 # 01 Y:2024 01 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $386,550 $1,582,496 n/a
OR0795 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $45,995 $522,500 n/a
OR0795 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $26,223 $1,293 n/a
OR0795 # 04 Y:2024 04 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,228 $13,714 n/a
IC0303 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,947 $546 Not Implemented
IC0303 # 01 Y:2024 01 2024 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,502 $3,692 Not Implemented
IC0303 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,368 $3,859 Not Implemented
IC0303 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $0 Not Implemented
IC0303 # 04 Y:2024 04 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $475 $0 Not Implemented
IC0303 # 05 Y:2024 05 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $31,214 $13,640 Implemented
IC0303 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $38 Not Implemented
IC0303 # 07 Y:2024 07 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $182 $328 Not Implemented
IC0303 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,438 $3,433 Implemented
IC0303 # 09 Y:2024 09 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,399 $4,154 Not Implemented
IC0303 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $3,324 $1,624 Implemented
IC0303 # 14 Y:2024 14 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $774 $36 Not Implemented
IC0303 # 15 Y:2024 15 2024 INSULATE BARE EQUIPMENT $2,406 $1,236 Not Implemented
IC0303 # 16 Y:2024 16 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $74,328 $441,248 Implemented