IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0795 # 04 Y:2024 04 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,228 $13,714 n/a
OR0795 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $26,223 $1,293 n/a
OR0795 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $45,995 $522,500 n/a
OR0795 # 01 Y:2024 01 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $386,550 $1,582,496 n/a
OR0770 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 02 Y:2023 02 2023 REDUCE SCRAP PRODUCTION $111,700 $282,420 Not Implemented
OR0770 # 01 Y:2023 01 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,142 $6,704 Implemented
OR0725 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $16,581 $12,780 Not Implemented
OR0725 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $58,445 $110,790 Implemented
OR0725 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $126,211 $375,000 Implemented
OR0725 # 04 Y:2019 04 2019 REPLACE BOILER $2,159 $0 Not Implemented
OR0717 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $20,973 $587 Not Implemented
OR0717 # 01 Y:2019 01 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,163 $0 Implemented
OR0717 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,061 $7,650 Not Implemented
OR0717 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,624 $3,273 Not Implemented
OR0717 # 05 Y:2019 05 2019 RECOVER AND REUSE WASTE MATERIAL $204,215 $143,400 Not Implemented
OR0696 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $10,116 Not Implemented
OR0696 # 03 Y:2017 03 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,365 $5,880 Not Implemented
OR0696 # 02 Y:2017 02 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,265 $37,275 Not Implemented
OR0696 # 01 Y:2017 01 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $179,573 $3,044 Not Implemented
OR0678 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,663 $247 Implemented
OR0678 # 01 Y:2016 01 2016 IMPROVE COMBUSTION CONTROL CAPABILITY $4,885 $2,948 Not Implemented
OR0678 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $972 $2,626 Implemented
OR0636 # 02 Y:2014 02 2014 UPGRADE OBSOLETE EQUIPMENT $55,473 $50,000 Not Implemented