Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 2082 | Malt Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0158 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $306 | $260 | Implemented |
UU0158 # 06 Y:2019 | 06 | 2019 | ELIMINATE/REDUCE AN OPERATION | $445 | $0 | Implemented |
UU0158 # 05 Y:2019 | 05 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $451 | $1,100 | Implemented |
UU0158 # 04 Y:2019 | 04 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $740 | $800 | Not Implemented |
UU0158 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $2,762 | Implemented |
UU0158 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,811 | $160 | Not Implemented |
UU0158 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $6,933 | $50,000 | Not Implemented |
UU0143 # 02 Y:2019 | 02 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,516 | $3,140 | Implemented |
UU0143 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $220 | $275 | Implemented |
UU0143 # 05 Y:2019 | 05 | 2019 | MINIMIZE WATER USAGE | $11,728 | $50,000 | Not Implemented |
UU0143 # 04 Y:2019 | 04 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,501 | $3,184 | Not Implemented |
UU0143 # 03 Y:2019 | 03 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $510 | $50 | Not Implemented |
UU0143 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $485 | $100 | Implemented |
UU0115 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,766 | $0 | Implemented |
UU0115 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $931 | $2,500 | Not Implemented |
UU0115 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $0 | Implemented |
UU0115 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $444 | $438 | Implemented |
UU0115 # 01 Y:2017 | 01 | 2017 | DISCONNECT BALLASTS | $296 | $0 | Implemented |
UU0076 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,000 | Not Implemented |
UU0076 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,982 | $2,220 | Not Implemented |
UU0076 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $5,360 | $1,500 | Not Implemented |
UU0076 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $4,824 | Not Implemented |
UU0076 # 03 Y:2004 | 03 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30 | $0 | Not Implemented |
UU0076 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24 | $40 | Not Implemented |