IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 2083 Malt
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0777 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,570 $0 Implemented
OR0777 # 02 Y:2023 02 2023 INSTALL COMMON HEADER ON COMPRESSORS $2,832 $6,989 Implemented
OR0777 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,479 $0 Implemented
CL2102 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $322 $453 Not Implemented
CL2102 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,176 $2,846 Implemented
CL2102 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,049 $0 Implemented
CL2102 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,814 $3,180 Implemented
OR0629 # 01 Y:2014 01 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $37,907 $21,000 Implemented
OR0629 # 02 Y:2014 02 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,863 $38,930 Not Implemented
OR0629 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $58,681 $3,764 Implemented
OR0629 # 04 Y:2014 04 2014 REPLACE BOILER $523,306 $3,403,664 Implemented
IP0021 # 05 Y:2014 05 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,336 $0 Not Implemented
IP0021 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,868 $5,580 Implemented
IP0021 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $349 $231 Not Implemented
IP0021 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $222 $118 Implemented
IP0021 # 04 Y:2014 04 2014 PAY BILLS ON TIME TO AVOID LATE FEES $1,181 $0 Implemented
IP0021 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $0 Implemented
IP0021 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,655 $0 Implemented
IP0021 # 01 Y:2014 01 2014 APPLY FOR INVESTMENT INCENTIVES $4,267 $0 Not Implemented
WI0521 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $630 $0 Not Implemented
WI0521 # 01 Y:2006 01 2006 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $222,888 $230,600 Not Implemented
WI0521 # 03 Y:2006 03 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,900 $18,000 Not Implemented
WI0521 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,408 $13,600 Not Implemented
WI0521 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $3,200 Not Implemented
WI0521 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,035 $500 Not Implemented