IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 2083 Malt
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0521 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,386 $11,000 Not Implemented
OR0494 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $77,000 $0 Not Implemented
OR0494 # 15 Y:2005 15 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,580 $19,700 Not Implemented
OR0494 # 14 Y:2005 14 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $107,700 $340,000 Implemented
OR0494 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,800 $49,400 Implemented
OR0494 # 12 Y:2005 12 2005 UPGRADE OBSOLETE EQUIPMENT $1,100 $1,300 Not Implemented
OR0494 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,400 $6,500 Implemented
OR0494 # 09 Y:2005 09 2005 REDUCE FLUID FLOW RATES $2,400 $0 Implemented
OR0494 # 08 Y:2005 08 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,100 $0 Implemented
OR0494 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,400 $0 Implemented
OR0494 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $0 Implemented
OR0494 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $55,000 $3,100 Implemented
OR0494 # 04 Y:2005 04 2005 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $36,800 $1,400 Not Implemented
OR0494 # 03 Y:2005 03 2005 REDUCE FLUID FLOW RATES $54,700 $630 Implemented
OR0494 # 02 Y:2005 02 2005 REDUCE FLUID FLOW RATES $63,500 $0 Implemented
OR0494 # 10 Y:2005 10 2005 UPGRADE CONTROLS ON COMPRESSORS $3,500 $2,320 Not Implemented
UU0067 # 06 Y:2004 06 2004 TREAT AND REUSE RINSE WATERS $635,880 $1,705,000 Not Implemented
UU0067 # 05 Y:2004 05 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $0 $40,000 Not Implemented
UU0067 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $25,126 $0 Implemented
UU0067 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,160 $200 Not Implemented
UU0067 # 03 Y:2004 03 2004 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $495 $400 Not Implemented
UU0067 # 04 Y:2004 04 2004 INSTALL WIND POWERED ELECTRIC GENERATOR $0 $0 Implemented
DS0053 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,015 $17,930 Implemented
DS0053 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,065 $48,791 Implemented
DS0053 # 03 Y:1996 03 1996 MINIMIZE WATER USAGE $113,670 $1,000 Implemented