IAC logo
IAC Assessment: DS0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Malt
NAICS n/a
SIC 2083 - Malt
Sales $10,000,000-$50,000,000
# of Employees 51
Plant Area (Sq.Ft.) 358,000
Annual Production 6,529,000 Bushels
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,101 19,269,344 kWh $0.02
Electricity Demand $417,209 45,084 kW-months/year $9.25
Electricity Fees $5,215 - $ -
Natural Gas $335,303 192,017 MMBtu $1.75
Fuel Oil #2 $1,388 230 MMBtu $6.03
Fuel Oil #6 $547,067 346,356 MMBtu $1.58
TOTAL ENERGY COSTS $2,137,538
RECOMMENDED SAVINGS* $177,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $177,955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,015
Cost:
$17,930
$2,550 150,059 $2,465 266 - - - - - - $2,550
150,059
kWh
$2,465
266
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,065
Cost:
$48,791
$3,807 223,916 $6,258 677 - - - - - - $3,807
223,916
kWh
$6,258
677
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
03: 3.4151 MINIMIZE WATER USAGE Savings:
$113,670
Cost:
$1,000
- - - - - - - - $113,670 40,500,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$113,670
40,500,000
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,379
Cost:
$48,780
$12,960 762,603 $3,419 370 - - - - - - $12,960
762,603
kWh
$3,419
370
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$32,826
Cost:
$17,550
- - - - $4,665 2,578 $7,369 4,663 $20,792 6,319,610 -
-
kWh
-
-
kW-months/year
$4,665
2,578
MMBtu
$7,369
4,663
MMBtu
$20,792
6,319,610
Tgal
TOTAL RECOMMENDED Savings:
$177,955
Cost:
$134,051
$19,317 1,136,578 $12,142 1,313 $4,665 2,578 $7,369 4,663 $134,462 46,819,610 $19,317
1,136,578
kWh
$12,142
1,313
kW-months/year
$4,665
2,578
MMBtu
$7,369
4,663
MMBtu
$134,462
46,819,610
Tgal
TOTAL IMPLEMENTED Savings:
$177,955
Cost:
$134,051
$19,317 1,136,578 $12,142 1,313 $4,665 2,578 $7,369 4,663 $134,462 46,819,610 $19,317
1,136,578
kWh
$12,142
1,313
kW-months/year
$4,665
2,578
MMBtu
$7,369
4,663
MMBtu
$134,462
46,819,610
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal