Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
174
matching recommendationsSIC | 2084 | Wines, Brandy, And Brandy Spirits |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0598 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,843 | $8,505 | Implemented |
SF0598 # 01 Y:2023 | 01 | 2023 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $10,131 | $0 | Implemented |
SF0598 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,805 | $1,551 | Implemented |
SF0598 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,883 | $23,100 | Implemented |
SF0596 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $1,185 | $2,397 | Implemented |
SF0596 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,903 | $1,551 | Implemented |
SF0596 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,166 | $9,707 | Implemented |
SF0596 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,982 | $4,346 | Implemented |
SF0580 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $228 | $574 | Implemented |
SF0580 # 01 Y:2021 | 01 | 2021 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $18,446 | $0 | Implemented |
SF0580 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,936 | $49,917 | Implemented |
SF0580 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,463 | $18,200 | Implemented |
SF0580 # 05 Y:2021 | 05 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,242 | $2,702 | Implemented |
SF0570 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,893 | $0 | Implemented |
SF0570 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $149,399 | $10,195 | Implemented |
SF0570 # 11 Y:2021 | 11 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,262 | $1,269,472 | Implemented |
SF0570 # 04 Y:2021 | 04 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $71,549 | $5,641 | Implemented |
SF0570 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $291 | $648 | Implemented |
SF0570 # 01 Y:2021 | 01 | 2021 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $24,674 | $0 | Implemented |
SF0570 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,387 | $6,315 | Implemented |
SF0569 # 01 Y:2021 | 01 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,931 | $0 | Implemented |
SF0569 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $5,693 | $9,138 | Implemented |
SF0569 # 07 Y:2021 | 07 | 2021 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $143,550 | $77,720 | Implemented |
SF0569 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $107,546 | $722,227 | Implemented |
SF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,279 | $6,956 | Implemented |