Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
181
matching recommendationsSIC | 2085 | Distilled And Blended Liquors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2413 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $96,023 | $1,156,200 | n/a |
UL2413 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,471 | $19,500 | n/a |
UL2413 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,007 | $52,000 | n/a |
UL2413 # 05 Y:2024 | 05 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $204,012 | $328,582 | n/a |
UL2413 # 01 Y:2024 | 01 | 2024 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $894 | $5,000 | n/a |
OR0753 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,927 | $278,534 | Not Implemented |
OR0753 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,938 | $40,624 | Not Implemented |
OR0753 # 01 Y:2022 | 01 | 2022 | MODIFY CURRENT INCENTIVE PROGRAM | $1,000 | $0 | Not Implemented |
UK2107 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $662 | $150 | n/a |
UK2107 # 04 Y:2021 | 04 | 2021 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,257 | $1,770 | n/a |
UK2107 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,085 | $797 | n/a |
UK2107 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,932 | $3,950 | n/a |
UK2107 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $2,733 | $2,931 | n/a |
UK2107 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,788 | $0 | n/a |
UK2106 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $1,142 | $640 | n/a |
UK2106 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,854 | $1,665 | n/a |
UK2106 # 11 Y:2021 | 11 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,154 | $600 | n/a |
UK2106 # 09 Y:2021 | 09 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $49,643 | $75,000 | n/a |
UK2106 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $330 | $80 | n/a |
UK2106 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $267 | $100 | n/a |
UK2106 # 10 Y:2021 | 10 | 2021 | INSULATE BARE EQUIPMENT | $1,250 | $881 | n/a |
UK2106 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,035 | $2,510 | n/a |
UK2106 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $685 | $1,660 | n/a |
UK2106 # 08 Y:2021 | 08 | 2021 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $731,255 | $3,500,000 | n/a |
UK2106 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,964 | $0 | n/a |