Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
176
matching recommendationsSIC | 2085 | Distilled And Blended Liquors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0753 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,938 | $40,624 | Not Implemented |
OR0753 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,927 | $278,534 | Not Implemented |
OR0753 # 01 Y:2022 | 01 | 2022 | MODIFY CURRENT INCENTIVE PROGRAM | $1,000 | $0 | Not Implemented |
UK2107 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,085 | $797 | n/a |
UK2107 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $2,733 | $2,931 | n/a |
UK2107 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,788 | $0 | n/a |
UK2107 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,932 | $3,950 | n/a |
UK2107 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $662 | $150 | n/a |
UK2107 # 04 Y:2021 | 04 | 2021 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,257 | $1,770 | n/a |
UK2106 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $1,142 | $640 | n/a |
UK2106 # 11 Y:2021 | 11 | 2021 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,154 | $600 | n/a |
UK2106 # 09 Y:2021 | 09 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $49,643 | $75,000 | n/a |
UK2106 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $330 | $80 | n/a |
UK2106 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $267 | $100 | n/a |
UK2106 # 10 Y:2021 | 10 | 2021 | INSULATE BARE EQUIPMENT | $1,250 | $881 | n/a |
UK2106 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,035 | $2,510 | n/a |
UK2106 # 08 Y:2021 | 08 | 2021 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $731,255 | $3,500,000 | n/a |
UK2106 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,964 | $0 | n/a |
UK2106 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,854 | $1,665 | n/a |
UK2106 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $685 | $1,660 | n/a |
AM0820 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,360 | $1,038 | Implemented |
AM0820 # 05 Y:2021 | 05 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,775 | $0 | Implemented |
AM0820 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,210 | $1,000 | Implemented |
AM0820 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,591 | $6,760 | Implemented |
AM0820 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $8,810 | $800 | Implemented |