Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,791
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0577 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,364 | $0 | n/a |
SU0577 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $299 | $63 | n/a |
SU0577 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $1,304 | $446 | n/a |
SU0577 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,400 | $0 | n/a |
SU0577 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,033 | $372 | n/a |
SU0577 # 07 Y:2025 | 07 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $11,453 | $34,327 | n/a |
SU0577 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,941 | n/a |
SU0576 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $472 | $18 | n/a |
SU0576 # 11 Y:2025 | 11 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $35,256 | $160,000 | n/a |
SU0576 # 12 Y:2025 | 12 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,946 | $668,352 | n/a |
SU0576 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,976 | $0 | n/a |
SU0576 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,941 | $17,246 | n/a |
SU0576 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $1,088 | $728 | n/a |
SU0576 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $287 | $403 | n/a |
SU0576 # 08 Y:2025 | 08 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $3,215 | $2,800 | n/a |
SU0576 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,825 | $372 | n/a |
SU0576 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,743 | $0 | n/a |
SU0576 # 10 Y:2025 | 10 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $221 | $899 | n/a |
SU0576 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,295 | $125 | n/a |
LS2515 # 05 Y:2025 | 05 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,344 | $26,721 | n/a |
LS2515 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,948 | $187,200 | n/a |
LS2515 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $10,625 | $35 | n/a |
LS2515 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,258 | $144,549 | n/a |
LS2515 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $55,591 | $576,000 | n/a |
LS2515 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,245 | $6,160 | n/a |