IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

788

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0123 # 06 Y:2001 06 2001 USE PHOTOCELL CONTROLS $3,349 $333 Implemented
LL0123 # 07 Y:2001 07 2001 DISCONNECT BALLASTS $909 $0 Implemented
MI0014 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $9,086 $867 Implemented
MI0014 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $661 $5 Implemented
MI0014 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,056 $20 Implemented
MI0014 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,454 $80 Implemented
LE0114 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,376 $0 Implemented
LE0114 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,207 $2,500 Implemented
LE0114 # 07 Y:2001 07 2001 TREAT AND REUSE RINSE WATERS $753 $3,750 Implemented
WV0193 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $493 $667 Implemented
WV0193 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $373 $190 Implemented
WV0193 # 10 Y:2000 10 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,928 $200 Implemented
WV0193 # 11 Y:2000 11 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $540 $80 Implemented
WV0193 # 12 Y:2000 12 2000 METER WASTE WATER $79,068 $1,000 Implemented
WV0193 # 13 Y:2000 13 2000 CLEAR AND RENT EXISTING SPACE $3,100 $2,000 Implemented
UD0572 # 02 Y:1999 02 1999 USE PLASTIC PALLETS INSTEAD OF WOOD $38,960 $110,457 Implemented
UD0572 # 04 Y:1999 04 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $9,457 $-27,115 Implemented
KU0514 # 01 Y:1999 01 1999 USE OPTIMUM TEMPERATURE $25,150 $9,360 Implemented
KU0514 # 03 Y:1999 03 1999 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,250 $280 Implemented
KU0514 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $1,120 $860 Implemented
KU0514 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $12,240 $22,300 Implemented
KU0514 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $490 $260 Implemented
KU0514 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,720 $288,000 Implemented
AM0346 # 01 Y:1999 01 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,650 $8,000 Implemented
AM0346 # 02 Y:1999 02 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,300 $15,000 Implemented