Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
799
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0291 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,755 | $1,050 | Implemented |
UF0291 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,917 | $6,752 | Implemented |
UF0291 # 04 Y:2002 | 04 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $22,067 | $40,280 | Implemented |
UF0291 # 05 Y:2002 | 05 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $1,124 | $450 | Implemented |
UF0291 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,424 | $490 | Implemented |
UF0291 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,235 | $25,190 | Implemented |
UF0291 # 11 Y:2002 | 11 | 2002 | MOVE BOILER TO MORE EFFICIENT LOCATION | $4,387 | $0 | Implemented |
UF0291 # 12 Y:2002 | 12 | 2002 | METER WASTE WATER | $4,133 | $1,500 | Implemented |
LL0123 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,416 | $1,740 | Implemented |
LL0123 # 02 Y:2001 | 02 | 2001 | INSULATE BARE EQUIPMENT | $2,174 | $1,308 | Implemented |
LL0123 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,389 | $2,686 | Implemented |
LL0123 # 06 Y:2001 | 06 | 2001 | USE PHOTOCELL CONTROLS | $3,349 | $333 | Implemented |
LL0123 # 07 Y:2001 | 07 | 2001 | DISCONNECT BALLASTS | $909 | $0 | Implemented |
MI0014 # 03 Y:2001 | 03 | 2001 | MODIFY STARTUP/SHUTDOWN TIMES | $9,086 | $867 | Implemented |
MI0014 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $661 | $5 | Implemented |
MI0014 # 06 Y:2001 | 06 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,056 | $20 | Implemented |
MI0014 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,454 | $80 | Implemented |
LE0114 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,376 | $0 | Implemented |
LE0114 # 06 Y:2001 | 06 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,207 | $2,500 | Implemented |
LE0114 # 07 Y:2001 | 07 | 2001 | TREAT AND REUSE RINSE WATERS | $753 | $3,750 | Implemented |
WV0193 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $493 | $667 | Implemented |
WV0193 # 05 Y:2000 | 05 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $373 | $190 | Implemented |
WV0193 # 10 Y:2000 | 10 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,928 | $200 | Implemented |
WV0193 # 11 Y:2000 | 11 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $540 | $80 | Implemented |
WV0193 # 12 Y:2000 | 12 | 2000 | METER WASTE WATER | $79,068 | $1,000 | Implemented |