Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
788
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0102 # 09 Y:1990 | 09 | 1990 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $370 | $150 | Implemented |
AM0093 # 01 Y:1990 | 01 | 1990 | REPAIR AND ELIMINATE STEAM LEAKS | $10,825 | $1,000 | Implemented |
AM0093 # 03 Y:1990 | 03 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,575 | $700 | Implemented |
AM0093 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $640 | $370 | Implemented |
AM0093 # 05 Y:1990 | 05 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $460 | $300 | Implemented |
AM0093 # 06 Y:1990 | 06 | 1990 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $330 | $0 | Implemented |
GT0375 # 01 Y:1989 | 01 | 1989 | USE OPTIMUM TEMPERATURE | $6,400 | $2,350 | Implemented |
GT0375 # 02 Y:1989 | 02 | 1989 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,289 | $2,366 | Implemented |
GT0375 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $206 | Implemented |
GT0375 # 05 Y:1989 | 05 | 1989 | CONVERT FROM BATCH TO CONTINUOUS OPERATION | $988 | $1,078 | Implemented |
GT0375 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,430 | $500 | Implemented |
WI0052 # 02 Y:1989 | 02 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $891 | $1,500 | Implemented |
KU0264 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,741 | $2,720 | Implemented |
KU0264 # 02 Y:1988 | 02 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $825 | $40 | Implemented |
KU0264 # 03 Y:1988 | 03 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $566 | $1,200 | Implemented |
KU0264 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $168 | $0 | Implemented |
TN0337 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,720 | $0 | Implemented |
TN0337 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,896 | $1,110 | Implemented |
TN0337 # 04 Y:1988 | 04 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $771 | $225 | Implemented |
TN0322 # 01 Y:1987 | 01 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $806 | $1,500 | Implemented |
TN0322 # 02 Y:1987 | 02 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $9,054 | $6,400 | Implemented |
TN0322 # 03 Y:1987 | 03 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,634 | $12,750 | Implemented |
TN0322 # 05 Y:1987 | 05 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,269 | $1,125 | Implemented |
TN0322 # 06 Y:1987 | 06 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $774 | $40 | Implemented |
TN0322 # 07 Y:1987 | 07 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $735 | Implemented |