IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0001 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,535 $1,894 Not Implemented
BS0001 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,616 Implemented
BS0001 # 06 Y:2012 06 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,034 $200 Implemented
BS0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $160 Implemented
BS0001 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $5,640 Not Implemented
BS0001 # 09 Y:2012 09 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,158 $2,282 Implemented
BD0404 # 01 Y:2012 01 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $49,969 $32,000 Not Implemented
BD0404 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,392 $76,240 Implemented
BD0404 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,023 $25,000 Not Implemented
BD0404 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $4,130 $8,000 Implemented
BD0404 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,137 $20 Implemented
BD0404 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,573 $1,500 Implemented
BD0404 # 07 Y:2012 07 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,669 $100 Implemented
UF0440 # 01 Y:2011 01 2011 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $43,145 $25,340 Not Implemented
UF0440 # 02 Y:2011 02 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,404 $5,896 Not Implemented
UF0440 # 03 Y:2011 03 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,173 $1,818 Not Implemented
UF0440 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $3,778 Not Implemented
UF0440 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,580 $12,180 Not Implemented
UF0440 # 06 Y:2011 06 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $136 $244 Not Implemented
UF0440 # 07 Y:2011 07 2011 INSTALL TURBULATORS $3,745 $3,750 Not Implemented
UF0440 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,493 $9,387 Not Implemented
UF0440 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $2,620 $243 Not Implemented
UF0440 # 10 Y:2011 10 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $635 $0 Not Implemented
UF0440 # 11 Y:2011 11 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,423 $840 Not Implemented
DL0064 # 01 Y:2011 01 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $707 $100 Not Implemented