IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0298 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $77,015 $56,771 Not Implemented
LE0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,178 $100,000 Implemented
LE0298 # 03 Y:2010 03 2010 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $8,306 $20,000 Not Implemented
LE0298 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,050 $2,440 Implemented
LE0298 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,536 $6,000 Not Implemented
LE0298 # 06 Y:2010 06 2010 USE RADIANT HEATER FOR SPOT HEATING $4,726 $3,900 Not Implemented
LE0298 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,787 $4,200 Not Implemented
LE0298 # 08 Y:2010 08 2010 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,423 $1,750 Not Implemented
LE0298 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,592 $12,000 Not Implemented
LE0298 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $327 $630 Implemented
AM0574 # 01 Y:2010 01 2010 MINIMIZE WATER USAGE $24,800 $10,000 Not Implemented
AM0574 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $7,100 $5,000 Not Implemented
AM0574 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,590 $52,875 Not Implemented
AM0574 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,336 $31,683 Not Implemented
AM0574 # 05 Y:2010 05 2010 USE SYNTHETIC LUBRICANT $1,845 $0 Not Implemented
AM0574 # 06 Y:2010 06 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,460 $0 Not Implemented
AM0574 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,410 $700 Not Implemented
AM0574 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $545 $0 Not Implemented
AM0574 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $240 $185 Not Implemented
AM0574 # 10 Y:2010 10 2010 CHECK FOR ACCURACY OF UTILITY / POWER METERS $111 $0 Not Implemented
SD0427 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $100 Not Implemented
SD0427 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,494 $2,714 Not Implemented
SD0427 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,124 $1,230 Not Implemented
SD0427 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,450 $10,035 Not Implemented
SD0427 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $2,200 Not Implemented