IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0377 # 05 Y:2008 05 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,506 $1,000 Implemented
WV0377 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $5,730 $815 Implemented
WV0377 # 07 Y:2008 07 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,754 $3,084 Not Implemented
WV0377 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,670 $0 Implemented
WV0377 # 09 Y:2008 09 2008 UPGRADE CONTROLS ON COMPRESSORS $2,273 $1,830 Not Implemented
WV0377 # 10 Y:2008 10 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,858 $7,053 Not Implemented
WV0377 # 11 Y:2008 11 2008 INSULATE BARE EQUIPMENT $1,335 $710 Implemented
WV0377 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,192 $1,202 Implemented
LE0267 # 01 Y:2008 01 2008 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $198,263 $200,000 Not Implemented
LE0267 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,140 $6,000 Implemented
LE0267 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,169 $30,000 Implemented
LE0267 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $31,944 $2,000 Implemented
LE0267 # 05 Y:2008 05 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,795 $30,000 Not Implemented
LE0267 # 06 Y:2008 06 2008 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,495 $31,435 Not Implemented
LE0267 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,200 $3,000 Implemented
LE0267 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,134 $1,500 Not Implemented
LE0267 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,723 $1,000 Implemented
LE0267 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,129 $300,000 Implemented
LE0114 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $979 $1,000 Not Implemented
LE0114 # 02 Y:2001 02 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $29,762 $76,790 Not Implemented
LE0114 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,037 $0 Not Implemented
LE0114 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,376 $0 Implemented
LE0114 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $76 $300 Not Implemented
LE0114 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,207 $2,500 Implemented
LE0114 # 07 Y:2001 07 2001 TREAT AND REUSE RINSE WATERS $753 $3,750 Implemented