IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0119 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,125 $402 Not Implemented
RU0119 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,932 $500 Not Implemented
AM0102 # 01 Y:1990 01 1990 RECOVER WASTE HEAT FROM EQUIPMENT $15,000 $5,000 Implemented
AM0102 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $7,969 $12,000 Implemented
AM0102 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,400 $540 Implemented
AM0102 # 04 Y:1990 04 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,000 $2,740 Implemented
AM0102 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $106 Implemented
AM0102 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $900 $0 Implemented
AM0102 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $40 Implemented
AM0102 # 08 Y:1990 08 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $488 $410 Implemented
AM0102 # 09 Y:1990 09 1990 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $370 $150 Implemented
AM0093 # 01 Y:1990 01 1990 REPAIR AND ELIMINATE STEAM LEAKS $10,825 $1,000 Implemented
AM0093 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,020 $9,750 Not Implemented
AM0093 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,575 $700 Implemented
AM0093 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $640 $370 Implemented
AM0093 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $300 Implemented
AM0093 # 06 Y:1990 06 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $330 $0 Implemented
AM0093 # 07 Y:1990 07 1990 INSULATE BARE EQUIPMENT $290 $710 Not Implemented
AM0093 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37 $27 Not Implemented
AM0093 # 09 Y:1990 09 1990 INSTALL SET-BACK TIMERS $140 $0 Not Implemented
GT0375 # 01 Y:1989 01 1989 USE OPTIMUM TEMPERATURE $6,400 $2,350 Implemented
GT0375 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,289 $2,366 Implemented
GT0375 # 03 Y:1989 03 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $17,740 $37,400 Not Implemented
GT0375 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $206 Implemented
GT0375 # 05 Y:1989 05 1989 CONVERT FROM BATCH TO CONTINUOUS OPERATION $988 $1,078 Implemented