Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,749
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0119 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,125 | $402 | Not Implemented |
RU0119 # 04 Y:1991 | 04 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,932 | $500 | Not Implemented |
AM0102 # 01 Y:1990 | 01 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,000 | $5,000 | Implemented |
AM0102 # 02 Y:1990 | 02 | 1990 | OPTIMIZE PLANT POWER FACTOR | $7,969 | $12,000 | Implemented |
AM0102 # 03 Y:1990 | 03 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,400 | $540 | Implemented |
AM0102 # 04 Y:1990 | 04 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,000 | $2,740 | Implemented |
AM0102 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,930 | $106 | Implemented |
AM0102 # 06 Y:1990 | 06 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $900 | $0 | Implemented |
AM0102 # 07 Y:1990 | 07 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $40 | Implemented |
AM0102 # 08 Y:1990 | 08 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $488 | $410 | Implemented |
AM0102 # 09 Y:1990 | 09 | 1990 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $370 | $150 | Implemented |
AM0093 # 01 Y:1990 | 01 | 1990 | REPAIR AND ELIMINATE STEAM LEAKS | $10,825 | $1,000 | Implemented |
AM0093 # 02 Y:1990 | 02 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,020 | $9,750 | Not Implemented |
AM0093 # 03 Y:1990 | 03 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,575 | $700 | Implemented |
AM0093 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $640 | $370 | Implemented |
AM0093 # 05 Y:1990 | 05 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $460 | $300 | Implemented |
AM0093 # 06 Y:1990 | 06 | 1990 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $330 | $0 | Implemented |
AM0093 # 07 Y:1990 | 07 | 1990 | INSULATE BARE EQUIPMENT | $290 | $710 | Not Implemented |
AM0093 # 08 Y:1990 | 08 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37 | $27 | Not Implemented |
AM0093 # 09 Y:1990 | 09 | 1990 | INSTALL SET-BACK TIMERS | $140 | $0 | Not Implemented |
GT0375 # 01 Y:1989 | 01 | 1989 | USE OPTIMUM TEMPERATURE | $6,400 | $2,350 | Implemented |
GT0375 # 02 Y:1989 | 02 | 1989 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,289 | $2,366 | Implemented |
GT0375 # 03 Y:1989 | 03 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $17,740 | $37,400 | Not Implemented |
GT0375 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $206 | Implemented |
GT0375 # 05 Y:1989 | 05 | 1989 | CONVERT FROM BATCH TO CONTINUOUS OPERATION | $988 | $1,078 | Implemented |