Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
233
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0293 # 02 Y:2002 | 02 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,940 | $30,000 | n/a |
UF0293 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,684 | $23,130 | n/a |
UF0293 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,852 | $550 | n/a |
UF0293 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,029 | $3,500 | n/a |
UF0293 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $4,753 | n/a |
UF0293 # 07 Y:2002 | 07 | 2002 | MOVE BOILER TO MORE EFFICIENT LOCATION | $1,449 | $0 | n/a |
UF0293 # 08 Y:2002 | 08 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $11,069 | $50,413 | n/a |
UF0293 # 09 Y:2002 | 09 | 2002 | INSTALL OCCUPANCY SENSORS | $3,373 | $828 | n/a |
UF0293 # 10 Y:2002 | 10 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $83,104 | $400,000 | n/a |
UF0293 # 11 Y:2002 | 11 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $642 | $1,895 | n/a |
UF0293 # 12 Y:2002 | 12 | 2002 | METER WASTE WATER | $5,209 | $1,700 | n/a |
UF0293 # 13 Y:2002 | 13 | 2002 | EXPAND OPERATIONS INTO UNUSED SPACE | $40,000 | $4,838 | n/a |
UF0293 # 14 Y:2002 | 14 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $133,295 | $97,500 | n/a |
UF0293 # 15 Y:2002 | 15 | 2002 | CHANGE OPERATING CONDITIONS | $4,941 | $5,000 | n/a |
UF0293 # 16 Y:2002 | 16 | 2002 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $2,808 | $864 | n/a |
UF0293 # 17 Y:2002 | 17 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $10,000 | $752 | n/a |
UF0291 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,755 | $1,050 | Implemented |
UF0291 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,427 | $192 | Not Implemented |
UF0291 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,917 | $6,752 | Implemented |
UF0291 # 04 Y:2002 | 04 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $22,067 | $40,280 | Implemented |
UF0291 # 05 Y:2002 | 05 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $1,124 | $450 | Implemented |
UF0291 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,424 | $490 | Implemented |
UF0291 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,235 | $25,190 | Implemented |
UF0291 # 08 Y:2002 | 08 | 2002 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $17,341 | $2,600 | Not Implemented |
UF0291 # 09 Y:2002 | 09 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,394 | $20,000 | Not Implemented |