IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0805 # 15 Y:2009 15 2009 OPTIMIZE PLANT POWER FACTOR $1,903 $5,000 Not Implemented
UD0805 # 11 Y:2009 11 2009 INSULATE BARE EQUIPMENT $3,797 $4,283 Implemented
UD0805 # 10 Y:2009 10 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,119 $0 Implemented
UD0805 # 09 Y:2009 09 2009 REDUCE EXCESSIVE BOILER BLOWDOWN $5,312 $5,000 Implemented
UD0805 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,938 $6,703 Implemented
UD0805 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,327 $8,043 Implemented
UD0805 # 06 Y:2009 06 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,710 $16,000 Not Implemented
UD0805 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $10,974 $2,000 Not Implemented
UD0805 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,872 $25,117 Implemented
UD0805 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,619 $17,147 Implemented
UD0805 # 02 Y:2009 02 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,769 $25,000 Not Implemented
UD0805 # 01 Y:2009 01 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $39,022 $12,000 Not Implemented
UD0805 # 18 Y:2009 18 2009 ISOLATE HOT OR COLD EQUIPMENT $666 $0 Implemented
UD0805 # 17 Y:2009 17 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,423 $0 Not Implemented
UD0805 # 16 Y:2009 16 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,428 $1,000 Implemented
UD0805 # 12 Y:2009 12 2009 CHECK FOR ACCURACY OF UTILITY / POWER METERS $3,741 $0 Not Implemented
UD0805 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,689 $0 Implemented
UD0805 # 14 Y:2009 14 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,965 $0 Implemented
UD0572 # 02 Y:1999 02 1999 USE PLASTIC PALLETS INSTEAD OF WOOD $38,960 $110,457 Implemented
UD0572 # 03 Y:1999 03 1999 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $28,186 $41,000 Not Implemented
UD0572 # 04 Y:1999 04 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $9,457 $-27,115 Implemented
UD0572 # 01 Y:1999 01 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $948,600 $580,553 Not Implemented
UD0167 # 06 Y:1985 06 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,387 $7,500 Not Implemented
UD0167 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $1,280 Implemented
UD0167 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,232 $10,000 Implemented