Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0211 # 02 Y:2022 | 02 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $233 | Not Implemented |
DL0211 # 01 Y:2022 | 01 | 2022 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,080 | $450 | Implemented |
DL0211 # 11 Y:2022 | 11 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,347 | $16,607 | Implemented |
DL0211 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,764 | $2,451 | Not Implemented |
DL0211 # 09 Y:2022 | 09 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $28,000 | $61,800 | Not Implemented |
DL0211 # 08 Y:2022 | 08 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $3,578 | $13,772 | Implemented |
DL0211 # 06 Y:2022 | 06 | 2022 | RECOVER AND REUSE COOLING WATER | $52,650 | $50,000 | Implemented |
DL0211 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,276 | $31,550 | Implemented |
DL0211 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,500 | $120,300 | Not Implemented |
DL0211 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,800 | $600 | Not Implemented |
DL0211 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,560 | $28,388 | Not Implemented |
NC0413 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $67,233 | $190,000 | Not Implemented |
NC0413 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,066 | $1,000 | Implemented |
NC0413 # 03 Y:2010 | 03 | 2010 | INSULATE FEEDWATER TANK | $283 | $337 | Implemented |
NC0413 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,796 | $50 | Implemented |
NC0413 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,881 | $100 | Implemented |
WV0342 # 01 Y:2006 | 01 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $151,419 | $4,500 | Implemented |
WV0342 # 02 Y:2006 | 02 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $124,707 | $188,500 | Implemented |
WV0342 # 03 Y:2006 | 03 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $103,142 | $100,000 | Implemented |
WV0342 # 04 Y:2006 | 04 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $87,693 | $208,500 | Implemented |
WV0342 # 05 Y:2006 | 05 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $76,391 | $42,250 | Implemented |
WV0342 # 06 Y:2006 | 06 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $74,909 | $77,050 | Not Implemented |
WV0342 # 07 Y:2006 | 07 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $41,893 | $112,000 | Implemented |
WV0342 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $26,961 | $1,000 | Implemented |
WV0342 # 09 Y:2006 | 09 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,439 | $2,700 | Implemented |