Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
253
matching recommendationsSIC | 2087 | Flavoring Extracts And Syrups, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0534 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,685 | $27,820 | Not Implemented |
UF0534 # 05 Y:2019 | 05 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,000 | $18,400 | Not Implemented |
UF0534 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,586 | $333,760 | Not Implemented |
UF0534 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,018 | $0 | Not Implemented |
UF0534 # 03 Y:2019 | 03 | 2019 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $8,399 | $570 | Not Implemented |
UF0514 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,847 | $20,000 | Implemented |
UF0514 # 04 Y:2017 | 04 | 2017 | REDUCE EXCESS STEAM BLEEDING | $4,320 | $0 | Implemented |
UF0514 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,154 | $30,844 | Implemented |
UF0514 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,432 | $0 | Implemented |
UF0514 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,740 | $2,882 | Implemented |
UF0514 # 03 Y:2017 | 03 | 2017 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,710 | $7,580 | Not Implemented |
UF0514 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,693 | $6,775 | Implemented |
UD0952 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,795 | $12,240 | Implemented |
UD0952 # 13 Y:2016 | 13 | 2016 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $17,619 | $90,000 | Not Implemented |
UD0952 # 05 Y:2016 | 05 | 2016 | INSULATE FEEDWATER TANK | $983 | $509 | Not Implemented |
UD0952 # 12 Y:2016 | 12 | 2016 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,559 | $23,200 | Not Implemented |
UD0952 # 03 Y:2016 | 03 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,277 | $0 | Not Implemented |
UD0952 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,764 | $1,000 | Implemented |
UD0952 # 11 Y:2016 | 11 | 2016 | DISCONNECT BALLASTS | $546 | $80 | Not Implemented |
UD0952 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $10,838 | $19,760 | Not Implemented |
UD0952 # 08 Y:2016 | 08 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,652 | $800 | Implemented |
UD0952 # 06 Y:2016 | 06 | 2016 | INSTALL TURBULATORS | $6,373 | $3,750 | Not Implemented |
UD0952 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,722 | $0 | Implemented |
UD0952 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,157 | $0 | Not Implemented |
UD0952 # 01 Y:2016 | 01 | 2016 | COMBINE UTILITY METERS | $26,792 | $0 | Implemented |