IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
Reset
SIC 2087 Flavoring Extracts And Syrups, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0534 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,685 $27,820 Not Implemented
UF0534 # 05 Y:2019 05 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,000 $18,400 Not Implemented
UF0534 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $53,586 $333,760 Not Implemented
UF0534 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,018 $0 Not Implemented
UF0534 # 03 Y:2019 03 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $8,399 $570 Not Implemented
UF0514 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,847 $20,000 Implemented
UF0514 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $4,320 $0 Implemented
UF0514 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,154 $30,844 Implemented
UF0514 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,432 $0 Implemented
UF0514 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,740 $2,882 Implemented
UF0514 # 03 Y:2017 03 2017 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,710 $7,580 Not Implemented
UF0514 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,693 $6,775 Implemented
UD0952 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,795 $12,240 Implemented
UD0952 # 13 Y:2016 13 2016 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $17,619 $90,000 Not Implemented
UD0952 # 05 Y:2016 05 2016 INSULATE FEEDWATER TANK $983 $509 Not Implemented
UD0952 # 12 Y:2016 12 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,559 $23,200 Not Implemented
UD0952 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,277 $0 Not Implemented
UD0952 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,764 $1,000 Implemented
UD0952 # 11 Y:2016 11 2016 DISCONNECT BALLASTS $546 $80 Not Implemented
UD0952 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $10,838 $19,760 Not Implemented
UD0952 # 08 Y:2016 08 2016 UPGRADE CONTROLS ON COMPRESSORS $1,652 $800 Implemented
UD0952 # 06 Y:2016 06 2016 INSTALL TURBULATORS $6,373 $3,750 Not Implemented
UD0952 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,722 $0 Implemented
UD0952 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,157 $0 Not Implemented
UD0952 # 01 Y:2016 01 2016 COMBINE UTILITY METERS $26,792 $0 Implemented