Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
253
matching recommendationsSIC | 2087 | Flavoring Extracts And Syrups, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0323 # 04 Y:2011 | 04 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,933 | $3,000 | Not Implemented |
LE0323 # 07 Y:2011 | 07 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,240 | $542 | Not Implemented |
NC0402 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $497 | $100 | Implemented |
NC0402 # 02 Y:2010 | 02 | 2010 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $3,632 | $14,000 | Implemented |
NC0402 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,787 | $0 | Not Implemented |
NC0402 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $0 | Implemented |
NC0402 # 05 Y:2010 | 05 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $445 | $1,454 | Implemented |
NC0402 # 06 Y:2010 | 06 | 2010 | COVER OPEN TANKS | $3,253 | $0 | Not Implemented |
TA0127 # 05 Y:2006 | 05 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $60 | $93 | Not Implemented |
TA0127 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,752 | $0 | Implemented |
TA0127 # 03 Y:2006 | 03 | 2006 | INSTALL REPLACEMENT DOORS | $285 | $486 | Not Implemented |
TA0127 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $625 | $100 | Implemented |
TA0127 # 01 Y:2006 | 01 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,212 | $0 | Implemented |
LE0246 # 02 Y:2006 | 02 | 2006 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $14,590 | $20,000 | Not Implemented |
LE0246 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $1,586 | $450 | Implemented |
LE0246 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,948 | $180,000 | Implemented |
LE0246 # 07 Y:2006 | 07 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $3,000 | $100 | Not Implemented |
LE0246 # 06 Y:2006 | 06 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,372 | $2,500 | Not Implemented |
LE0246 # 05 Y:2006 | 05 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,033 | $5,000 | Implemented |
LE0246 # 04 Y:2006 | 04 | 2006 | MINIMIZE WATER USAGE | $6,264 | $1,800 | Not Implemented |
LE0246 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,683 | $6,700 | Implemented |
LE0246 # 01 Y:2006 | 01 | 2006 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $66,327 | $5,000 | Implemented |
OR0483 # 06 Y:2005 | 06 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $40,390 | $72,000 | Implemented |
OR0483 # 05 Y:2005 | 05 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,000 | $69,000 | Implemented |
OR0483 # 07 Y:2005 | 07 | 2005 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $5,131 | $15,000 | Not Implemented |