Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
260
matching recommendationsSIC | 2087 | Flavoring Extracts And Syrups, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0246 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,948 | $180,000 | Implemented |
LE0246 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $1,586 | $450 | Implemented |
LE0246 # 01 Y:2006 | 01 | 2006 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $66,327 | $5,000 | Implemented |
LE0246 # 02 Y:2006 | 02 | 2006 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $14,590 | $20,000 | Not Implemented |
OR0483 # 07 Y:2005 | 07 | 2005 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $5,131 | $15,000 | Not Implemented |
OR0483 # 06 Y:2005 | 06 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $40,390 | $72,000 | Implemented |
OR0483 # 05 Y:2005 | 05 | 2005 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $41,000 | $69,000 | Implemented |
OR0483 # 04 Y:2005 | 04 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $8,960 | $3,000 | Implemented |
OR0483 # 03 Y:2005 | 03 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $5,100 | Implemented |
OR0483 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $24,290 | $4,400 | Implemented |
OR0483 # 01 Y:2005 | 01 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $21,624 | $0 | Implemented |
UF0319 # 07 Y:2003 | 07 | 2003 | MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM | $53,240 | $38,924 | Not Implemented |
UF0319 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,379 | $9,534 | Implemented |
UF0319 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $3,600 | $20,000 | Not Implemented |
UF0319 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $1,277 | $825 | Implemented |
UF0319 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,151 | $17,945 | Not Implemented |
UF0319 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,620 | $0 | Implemented |
UF0319 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,140 | $52,700 | Not Implemented |
UF0314 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,357 | $165,670 | Not Implemented |
UF0314 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,569 | $2,000 | Not Implemented |
UF0314 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,414 | $8,936 | Implemented |
UF0314 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $84,571 | $191,945 | Implemented |
UF0314 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $29,609 | $3,005 | Not Implemented |
UF0314 # 06 Y:2003 | 06 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $375,940 | $302,000 | Not Implemented |
UF0314 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $135,000 | $32,000 | Not Implemented |