IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2087 Flavoring Extracts And Syrups, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0249 # 09 Y:1999 09 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $3,600 $0 Not Implemented
MO0249 # 08 Y:1999 08 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $165 $0 Not Implemented
MO0249 # 07 Y:1999 07 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,319 $500 Not Implemented
MO0249 # 06 Y:1999 06 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,235 $13,133 Implemented
MO0249 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,112 $80 Not Implemented
MO0249 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $649 $97 Implemented
MO0249 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,335 $3,538 Implemented
MO0249 # 02 Y:1999 02 1999 MODIFY CURRENT INCENTIVE PROGRAM $3,480 $4,750 Not Implemented
MO0249 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,197 $0 Implemented
KU0372 # 02 Y:1992 02 1992 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $91,322 $0 Not Implemented
KU0372 # 13 Y:1992 13 1992 INSULATE BARE EQUIPMENT $3,082 $10,685 Implemented
KU0372 # 10 Y:1992 10 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,785 $70,400 Not Implemented
KU0372 # 01 Y:1992 01 1992 USE MULTIPLE-EFFECT EVAPORATORS $133,326 $720,000 Not Implemented
KU0372 # 03 Y:1992 03 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $46,997 $208,233 Not Implemented
KU0372 # 04 Y:1992 04 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $35,349 $117,700 Not Implemented
KU0372 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,723 $39,435 Not Implemented
KU0372 # 06 Y:1992 06 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $32,127 $90,000 Implemented
KU0372 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $29,914 $0 Implemented
KU0372 # 08 Y:1992 08 1992 REPAIR AND ELIMINATE STEAM LEAKS $5,325 $670 Implemented
KU0372 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,789 $10,400 Implemented
KU0372 # 12 Y:1992 12 1992 INSTALL TIMERS AND/OR THERMOSTATS $4,086 $0 Not Implemented
KU0372 # 11 Y:1992 11 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,367 $8,000 Not Implemented
MO0037 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $401 $292 Implemented
MO0037 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $774 $20 Implemented
MO0037 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $649 Implemented