Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 2087 | Flavoring Extracts And Syrups, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0386 # 07 Y:2014 | 07 | 2014 | REPLACE BOILER | $102,338 | $161,800 | Not Implemented |
LE0386 # 05 Y:2014 | 05 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $451 | $232 | Not Implemented |
LE0386 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,910 | $1,000 | Implemented |
LE0386 # 08 Y:2014 | 08 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,813 | $20,000 | Not Implemented |
LE0386 # 06 Y:2014 | 06 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,502 | $16,700 | Implemented |
LE0386 # 02 Y:2014 | 02 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $61,300 | $2,592 | Implemented |
LE0386 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $32 | Implemented |
LE0386 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $43,975 | $10,000 | Implemented |
LE0386 # 10 Y:2014 | 10 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,010 | $6,000 | Not Implemented |
LE0386 # 09 Y:2014 | 09 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $757 | $2,250 | Implemented |
LE0323 # 02 Y:2011 | 02 | 2011 | USE SOLAR HEAT TO HEAT WATER | $11,446 | $21,000 | Not Implemented |
LE0323 # 09 Y:2011 | 09 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $778 | $0 | Implemented |
LE0323 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,384 | $1,000 | Implemented |
LE0323 # 04 Y:2011 | 04 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,933 | $3,000 | Not Implemented |
LE0323 # 05 Y:2011 | 05 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,867 | $192 | Not Implemented |
LE0323 # 06 Y:2011 | 06 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,360 | $6,000 | Implemented |
LE0323 # 07 Y:2011 | 07 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,240 | $542 | Not Implemented |
LE0323 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $837 | $2,921 | Implemented |
LE0323 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,859 | $30,000 | Not Implemented |
LE0246 # 07 Y:2006 | 07 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $3,000 | $100 | Not Implemented |
LE0246 # 06 Y:2006 | 06 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,372 | $2,500 | Not Implemented |
LE0246 # 05 Y:2006 | 05 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,033 | $5,000 | Implemented |
LE0246 # 04 Y:2006 | 04 | 2006 | MINIMIZE WATER USAGE | $6,264 | $1,800 | Not Implemented |
LE0246 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,683 | $6,700 | Implemented |
LE0246 # 02 Y:2006 | 02 | 2006 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $14,590 | $20,000 | Not Implemented |