IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 2087 Flavoring Extracts And Syrups, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0386 # 07 Y:2014 07 2014 REPLACE BOILER $102,338 $161,800 Not Implemented
LE0386 # 05 Y:2014 05 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $451 $232 Not Implemented
LE0386 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,910 $1,000 Implemented
LE0386 # 08 Y:2014 08 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,813 $20,000 Not Implemented
LE0386 # 06 Y:2014 06 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,502 $16,700 Implemented
LE0386 # 02 Y:2014 02 2014 REPAIR AND ELIMINATE STEAM LEAKS $61,300 $2,592 Implemented
LE0386 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,661 $32 Implemented
LE0386 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,975 $10,000 Implemented
LE0386 # 10 Y:2014 10 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,010 $6,000 Not Implemented
LE0386 # 09 Y:2014 09 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $757 $2,250 Implemented
LE0323 # 02 Y:2011 02 2011 USE SOLAR HEAT TO HEAT WATER $11,446 $21,000 Not Implemented
LE0323 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $778 $0 Implemented
LE0323 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,384 $1,000 Implemented
LE0323 # 04 Y:2011 04 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,933 $3,000 Not Implemented
LE0323 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,867 $192 Not Implemented
LE0323 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,360 $6,000 Implemented
LE0323 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,240 $542 Not Implemented
LE0323 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $2,921 Implemented
LE0323 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,859 $30,000 Not Implemented
LE0246 # 07 Y:2006 07 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $3,000 $100 Not Implemented
LE0246 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,372 $2,500 Not Implemented
LE0246 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,033 $5,000 Implemented
LE0246 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $6,264 $1,800 Not Implemented
LE0246 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,683 $6,700 Implemented
LE0246 # 02 Y:2006 02 2006 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $14,590 $20,000 Not Implemented