IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,332

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0706 # 02 Y:2005 02 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,672 $13,451 Implemented
CO0562 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $240 Implemented
CO0562 # 04 Y:2005 04 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $150 $120 Implemented
CO0562 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,530 $2,350 Implemented
CO0562 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $430 Implemented
WI0481 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,863 $1,280 Implemented
WI0481 # 09 Y:2005 09 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,080 $500 Implemented
WI0481 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $1,933 $250 Implemented
WI0481 # 12 Y:2005 12 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $700 $1,700 Implemented
UU0077 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,520 $5,000 Implemented
UU0077 # 03 Y:2004 03 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $14,890 $45,000 Implemented
LL0205 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,430 $1,080 Implemented
LL0205 # 08 Y:2004 08 2004 $4,750 $1,820 Implemented
MS0259 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,687 $150 Implemented
MS0259 # 06 Y:2004 06 2004 HEAT WATER WITH EXHAUST HEAT $5,972 $0 Implemented
MS0259 # 07 Y:2004 07 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,481 $245,000 Implemented
MS0259 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,277 $0 Implemented
AS0389 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,163 $1,698 Implemented
AS0389 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,971 $7,343 Implemented
MI0092 # 02 Y:2004 02 2004 $21,190 $50,000 Implemented
MI0092 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,031 $1,350 Implemented
SF0287 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,741 $0 Implemented
SF0287 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,664 $0 Implemented
SF0287 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,720 $0 Implemented
SF0287 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $697 $5,675 Implemented