IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,340

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0072 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40 $49 Implemented
OR0072 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,874 $7,000 Implemented
KU0285 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,382 $1,500 Implemented
KU0285 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,527 $24,000 Implemented
KU0285 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,478 $22,600 Implemented
KU0285 # 06 Y:1989 06 1989 INSTALL AUTOMATIC STACK DAMPER $3,601 $7,600 Implemented
KU0285 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $906 $2,500 Implemented
KU0285 # 08 Y:1989 08 1989 RECOVER AND REUSE COOLING WATER $16,548 $2,500 Implemented
KU0285 # 11 Y:1989 11 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,539 $50,000 Implemented
CO0153 # 01 Y:1989 01 1989 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,887 $48 Implemented
CO0153 # 02 Y:1989 02 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,814 $4,100 Implemented
CO0153 # 06 Y:1989 06 1989 INSTALL TURBULATORS $1,483 $1,200 Implemented
CO0153 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $0 Implemented
OR0056 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $252 $0 Implemented
OR0056 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,873 $100 Implemented
OR0056 # 03 Y:1989 03 1989 MINIMIZE WATER USAGE $3,946 $1,683 Implemented
OR0056 # 04 Y:1989 04 1989 KEEP BOILER TUBES CLEAN $1,821 $100 Implemented
OR0056 # 06 Y:1989 06 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,201 $2,750 Implemented
OK0276 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $0 Implemented
OK0276 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $541 Implemented
OK0276 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $142 $366 Implemented
OK0276 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $0 Implemented
OK0276 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $248 $437 Implemented
LT0144 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,927 $0 Implemented
LT0144 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34 $17 Implemented